Yes, a very tired dog. This morning we ventured deeper into the fens than ever before and had our longest walk. The poor old hound was exhausted, but was a lovely walk and very interesting, too.
Further on our walk, we came across part of the new path being built by the National Trust to connect Wicken Fen Nature Reserve to Cambridge. They've even built a posh new bridge across Swaffham Lode. They're also cleverly making the path twice as long as it needs to be by making it snake across the landscape.
Some time ago, I read how one of the major drainage ditches on the fen (the Commissioner's Drain, I believe) went under Swaffham Lode and I imagined a tunnel going deep underground.
In fact, the lode is at quite a high level, so the drain goes under it at about ground level. It was difficult to get a picture which illustrates this, so I took two - one of each side of the lode, from the top of the embankment.
Next time we travel that way, I'll try to get down to the level of the drain to see the entrance.
Further down the lode we came to the pumping station where it joins the River Cam. There's an old fashioned lock gate, but the work seems to be done by a modern steel rising gate. I thought the river level would be much higher that the lode, but in fact, the lode was higher.
From here, we turned towards Cambridge along the banks of the Cam - a peaceful spot to have a houseboat, though the 'taggers' still managed to leave their mark at the Bottisham Lode pumping station, which is really a long way from anywhere.
Finally, with the dog (and me) flagging, it was time to head for home. Just time to capture one of those big fen skies.
1 comment:
Love that part of the country, DW.
I scared myself one year out the back of Chippenham Fen when I was cycling - and came across a huge deer. I have never cycled so fast in my life...
Post a Comment